Homework: Waterfall vs. Scrum vs. Kanban
- Due Sep 10, 2021 by 11am
- Points 5
- Submitting a file upload
- File Types doc, docx, pdf, and txt
- Available after Sep 8, 2021 at 11am
Waterfall documentation
Kanban (Atlassian) https://www.atlassian.com/agile/kanban
Links to an external site.
Read all of the following:
- skim these Waterfall documents from a 2015 class project that simulated a company developing software for a client; concentrate on getting a feel for the level of detail each contains
- Communications Links to an external site. (for context of the project)
- Software Requirements Specification (SRS) Links to an external site.
- Software Design Document (SDD) Links to an external site.
- Software Quality Assurance Plan (SQAP) Links to an external site.
- Software Testing Plan (STP) Links to an external site.
- Kanban Links to an external site.(Atlassian; read all the sections: Overview, Boards, WIP limits, Kanban vs Scrum, Kanplan, and Cards)
Write a few paragraphs reflecting on the following questions:
- How would we tackle development of the OCG software if we followed Scrum instead of Waterfall?
- How would a Kanban approach be different from Scrum for OCG development?
- Which of these three do you think you'd prefer and why?
As usual, please include your name, the date, and the assignment name at the top of your submission.